
Multilander
™
Operator’s Manual
Secure the boom to the tongue with the two (2) chassis clamps, four (4) M10 X 60 mm flanged
hex bolts, and four (4) M10 flanged lock nuts.
When tightening the bolts, tighten the left and right sides of each chassis clamp incrementally
until the clamps are fully seated. Ensure the clamps do not sit askew.
Once the boom if fully assembled to the tongue, continue with the trailer assembly on the
MLTR-MY2020-EN: Rev B
Page
of
29
44
22-Jan-2021
Содержание MULTILANDER
Страница 2: ...This page intentionally left blank...
Страница 40: ...Multilander Operator s Manual EXPLODED ASSEMBLY VIEWS CHASSIS MLTR MY2020 EN Rev B Page of 38 44 22 Jan 2021...
Страница 41: ...Multilander Operator s Manual WALKING BEAMS MLTR MY2020 EN Rev B Page of 39 44 22 Jan 2021...
Страница 42: ...Multilander Operator s Manual LOG RACKS MLTR MY2020 EN Rev B Page of 40 44 22 Jan 2021...
Страница 43: ...Multilander Operator s Manual LOG RACKS INSTALLED MLTR MY2020 EN Rev B Page of 41 44 22 Jan 2021...
Страница 44: ...Multilander Operator s Manual TONGUE JACK STAND MLTR MY2020 EN Rev B Page of 42 44 22 Jan 2021...
Страница 45: ...Multilander Operator s Manual WHEELS MLTR MY2020 EN Rev B Page of 43 44 22 Jan 2021...
Страница 46: ...Multilander Operator s Manual NOTES MLTR MY2020 EN Rev B Page of 44 44 22 Jan 2021...
Страница 47: ...This page intentionally left blank...
Страница 48: ......