![Woodland Mills HM130MAX Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/woodland-mills/hm130max/hm130max_operators-manual_995004024.webp)
HM130MAX Operator’s Manual
5. SAWMILL HEAD ASSEMBLY
The sawmill head assembly is built in multiple steps. Follow the sub-sections below using the
parts table at the top of each sub-section to gather the necessary components for each step.
FRONT POSTS
With the sawhead resting approximately 6 in [150 mm] above the ground, slide the two (2) front
posts through the post sleeves. Orient the posts so that the ends with the wider hole spacing
are towards the bottom of the assembly. The top ends will be capped in a later step.
2x
Front Post
HM130MAX-MY2020: Rev B
Page
of
22
92
04-Dec-2019
Wider hole
spacing on
posts at this end
Содержание HM130MAX
Страница 2: ...This page intentionally left blank...
Страница 93: ...HM130MAX Operator s Manual NOTES HM130MAX MY2020 Rev B Page of 91 92 04 Dec 2019...
Страница 94: ...HM130MAX Operator s Manual HM130MAX MY2020 Rev B Page of 92 92 04 Dec 2019...
Страница 95: ...This page intentionally left blank...
Страница 96: ......