
SETUP & OPERATION
Moulder Operation, MP150
4
4-21
EGdoc042320
Operation
4.5
Moulder Operation, MP150
4.5.1 Control Overview
See Figure 4-21
The controls of the MP150 moulder are shown below:
1. Key Switch
The key switch has three positions:
“0” position - all electrical circuits are off,
position - all electrical circuits are on,
position - releases the motor brake.
2. Safety Button
Stops the cutter motor when released.
3. Motor START Button
Starts the cutter motor. The motor can be started only when the safety handle is being held.
FIG. 4-21
Safety Button
Emergency Stop
Button
Key Switch
Motor START
Button
Up/Down Drive
Switch
Feed Rate
Adjustment
I
II
START
WMM081
Power Feed Drive
Switch
Содержание MP100 E5S
Страница 1: ......
Страница 2: ......
Страница 47: ...SETUP OPERATION Moulder Setup Operation EGdoc042320 4 2 4 1ph 230 VAC UL 70 A class J 7 AWG 10mm2 TABLE 4 1 ...