Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation
30S97doc041910
4-22
4
13.
Place both fenders in the slots located behind the trailer tires and secure with retaining
pins (prior to 6/00) or rubber straps (6/00+). Raise all but the very front outrigger.
For Fine Adjust Outriggers (FAOs), be sure to adjust the outrigger base height so that the
grease fitting is just below the lowest outrigger hole before securing the FAO in position
with the lock pin.
CAUTION!
Be sure the outrigger base is adjusted properly
before securing the FAO in position with the lock pin. Fail-
ure to do so will cause damage to the outrigger grease fit-
ting.
CAUTION!
Do not adjust the FAO outrigger base height
while there is weight on the FAO. Damage to the FAO may
result.
See the trailer operator’s manual for specific information regarding hitch operation and
towing the sawmill.