
LubeMizer Installation
Control Box Wiring
1
1-4
LMS99doc032619
LubeMizer Installation
1.3
Control Box Wiring
LT30 Super
Rev. F7.00 - G8.00
LT40 Super
Rev. F8.00 - G9.00
LT30HD/40HD Super
Rev. G1.00 - H3.00
DANGER!
The key switch should still be off, the key
removed and the negative battery cable disconnected as
stated at the beginning of this section. The incoming power
supply of electric-powered sawmills should be discon-
nected and locked out. Failure to do so will result in serious
injury or death.
IMPORTANT!
Avoid pinch and pivot points, unnecessary
wire bending and open spaces where the wire could get
caught by a log, etc. If you have any questions, call
Wood-Mizer customer service.
Refer to the appropriate wiring diagram while performing the wiring steps below.
Locate red wire #19 connected to terminal #2 of the power feed drum switch. Cut
wire #19 approximately 5" from terminal #2.
Install a female terminal to the end of the 5" length of wire #19 that remains con-
nected to terminal #2. Install a male terminal to the end of the remaining length of
wire #19.
See Figure 1-2.
Connect red lube wire #250 to the female terminal on the 5" length of wire #19. Con-
nect red lube wire #251 to the male terminal on the remaining length of wire #19.
Locate black wire #20 connected to the ground stud at the rear of the sawmill con-
trol box. Cut wire #20 approximately 5" from the ground stud.
FIG. 1-2
Female Terminal
Male Terminal
3H0761