Operation
Obsługa maszyny
EGdoc031120
3-2
3
3.1
Operation
3.2
Pre-Operation Check
Prior to operating the Edger; always perform these basic checks:
1.
Make sure the Edger is level. Secure the edger to the ground. A concrete foundation and 12mm
anchored bolts are recommended.
CAUTION!
Make sure the edger is level before operation. Failure to do
so can and will affect machine operation and wear life.
2.
Make sure the tables are level with the rest of the Edger.
Be sure the anti-kickback fingers are in proper working condition.
WARNING!
Always ensure that there is a sharp point on the
anti-kickback fingers before each use of the Edger.
Be sure the anti-kickback fingers are free from obstruction and are in
their downward position with the lever released. Failure to do so may
result in serious injury.
WARNING!
In case of a rive belt break, wait until all rotating parts are
completely stop Failure to do so may result in serious injury or death.
WARNING!
If edger is equipped with an optional sawdust removal belt,
use extreme care not to trip over it.
See figure 3-1.
WARNING!
Make sure anti-kickback levers (A)
are in working position
(in the notches located in the sheet (B)). Failure to do so may result in
serious injury.
Содержание EG800EH40S
Страница 1: ......
Страница 2: ......
Страница 22: ...3 3 1 EGdoc031120 Obsługa maszyny SECTION 3 ...