INSTALLATION
Installation and Setup
3
3-2
EGdoc020420
Operation
Have a qualified electrician install the power supply (according to EN 60204). The power
supply must meet the specifications given in the table below.
See Table 3-1.
IMPORTANT!
It is recommended that the electrical system
be equipped with a 30mA Ground Fault Interrupter.
IMPORTANT!
When starting the machine for the first time, check that
the blade rotation direction is as indicated by the arrow located on the
blade cover. If the rotation direction is incorrect, invert the phases in
the phase inverter located in the power socket (electric box). Setting
the phases in the phase inverter correctly will ensure correct rotation
directions of all machine motors.
IMPORTANT!
When starting the machine for the first time, let it run
without any load for 1-2 hours so that the drive components of the
infeed and outfeed tables break in.
3.2
Installation and Setup
The EG100 edger can be lifted using a forklift truck or a winch. The lifting capacity of the forklift
must be at least 1000 kg. Special holes for the lifting hooks are provided on the upper blade
cover. Use transport belts and hooks to secure the machine to the lifting equipment.
3 Phases V
Fused Disconnect
Switch
Recommended Wire Size
400 VAC
40 A
4 mm
2
, maximum length:
15 m
TABLE 3-1
!!
!
!
Содержание EG100EH11S
Страница 1: ......
Страница 2: ......
Страница 25: ...INSTALLATION Installation and Setup Operation EGdoc020420 3 3 3 See Figure 3 2 FIG 3 2 ...
Страница 31: ...INSTALLATION Movable Blade Horizontal Adjustment Operation EGdoc020420 3 9 3 See Figure 3 8 FIG 3 8 ...
Страница 33: ...INSTALLATION Blade Position Lock Adjustment Operation EGdoc020420 3 11 3 See Figure 3 10 FIG 3 10 ...
Страница 42: ...INSTALLATION Table Installation 3 3 20 EGdoc020420 Operation See Figure 3 22 FIG 3 22 ...
Страница 52: ...INSTALLATION Drive Pulley Sprocket Adjustment 3 3 30 EGdoc020420 Operation See Figure 3 34 FIG 3 34 FIG 3 35 ...