Preliminary operations
Foundation
3
3-2
15doc030910
Preliminary operations
3.2
Foundation
The machine must be set up on a previously prepared concrete foundation minimum B20 grade.
The dimensions that you need to prepare the foundation are shown in Figure 2.
Before securing the machine to the foundation, perform the following steps:
a) Remove the transportation skid,
b) Insert M12 x 120 foundation bolts through the holes in the machine body,
c) Place the machine on the foundation,
d) Reinstall all elements removed previously for transportation reasons,
e) Level the machine within the accuracy of 0.1 mm to 1 mm in two rectangular directions by
putting a level on the tables.
After performing the above steps, fasten the machine to the foundation.
Fig.2
Notice:
Application of anti vibration insulators when fixing the machine on the foundation has a positive
effect on the wear and tear of cutter shaft bearing nest and vertical spindles as well as on the