Preliminary operations
Transport method
Preliminary operations
15doc030910
3-1
3
SECTION 3 PRELIMINARY OPERATIONS
3.1
Transport method
It is recommended to use a fork-lift truck when transporting the machine tool.
Fig.1
Remarks
1) The machine tool to be transported should be completely maintained and provided with trans-
portation skid. Equipment elements should be packed in plastic bags.
2) After having transported the machine- tool and positioning it all the maintenance grease
should be removed from all unpainted surfaces. Inspect all parts and in case paint coating has
been damaged give it anti-corrosion protection.
Check if the following elements has been damaged or deformed:
-
cutter shafts and their inserts, pressure screws, bearings and shaft housings.
-
Electrical motors
-
Material guideline
-
Control buttons
The damaged elements should be replaced with new ones. After protective coating removal,
mount all dismounted for transportation reasons elements back on the machine tool.
fork-lift
Felt insert
j001