Commissioning
50 | WOLF GmbH 3066501_201910
6.5
Configuring the system
BM-2 programming unit installation and operating instructions for contractors
AM display module installation and operating instructions for contractors
The commissioning assistant provides assistance with the following settings:
– Standard settings (language, date, time)
– User interface simplified / extended
– Heating appliance configuration
– Configuration of the modules embedded in the eBus
– System configuration (
7.2.21 HG40: System configuration
)
– Service message
– Pasteurisation function (start time)
– Maximum DHW temperature
)
– Heating circuit pump venting (
– Screed drying
✔
The commissioning assistant is closed automatically after the final configuration.
► To open the commissioning assistant again, perform a reset of the control module.
i
A parameter reset is only possible for control modules connected to the heat generator.
6.6
Venting pumps and TS stratification cylinder
6.6.1
Venting feed/heating circuit pump
Installation instructions for feed/heating circuit pump
► Check the system pressure.
System pressure over 1.5 bar:
✔
heating circuit is completely vented.
System pressure below 1.5 bar:
► Top up with water.
► Vent the feed/heating circuit pump again.
6.6.2
Vent heating circuit of the TS stratification cylinder
► Activate the DHW demand.
► Set the ON/OFF switch of the cylinder primary pump to
venting
.
► Vent the system completely at the maximum system temperature.
► Set the cylinder primary pump to
constant pressure
again.
Fig. 6.3
Cylinder primary pump
q
ON/OFF switch
w
Venting
e
Constant diff. pressure
r
Variable diff. pressure