MOTUS®C14 Operating Instructions
Page
49
of
73
94 762 000 B
Revision 03.2022
English.
7.3 Standard connection
•
The standard connection is made using a 16-pin connector. Connect the cables to the
control plug of the motor starter.
•
To put the motor into operation, you
have to
enable the device via the enable input.
•
As soon as a valid signal is present at the enable input (at terminals EN + and EN-), the
device will accept control commands.
•
It is possible to assign a persistent valid signal at the enable inputs through connecting
terminals (
6
) and (
5
) as well as terminals (
8
) and (
7
).
7.3.1 3-Phase Configuration
Figure 8
Pin assignment
– Control Plug, 3~-Configuration
•
The control inputs
Clockwise
,
Counterclockwise
and
Reset
are galvanically isolated
from the 24V control circuit.
•
Common reference for those control inputs is terminal
GND for inputs
.
•
The enable terminals
and
Enable -
are galvanically isolated from the 24V control
circuit and from the other control inputs.
•
Since a base insulation exists, it is allowed to wire the terminals
GND for inputs
and
GND
together.
WARNING:
Do not use control voltages > 24V.
Control voltages >24V will damage the device.
CAUTION:
The configuration/parameterization of 1-phase operation is carried
out exclusively via IO-Link or ServiceTool. Parameterization
via the display is currently not possible.
2
Clockwise
1
24 V / L+
4
Counterclockwise
3
GND / L-
6
24 V / L+
5
8
GND / L-
7
Enable -
10
Reset
9
Not connected
12
GND for inputs
11
C/Q (IO-Link)
14
98 (Error NO)
13
96 (Error NC)
16
12 (Warning NC)
15
95/11 (Common)
!
!