Operating manual
Page 25 of 32
B0102
GMI / GML / SAB / GOI
8.3
Inspection schedule
No.
Description
Interval
1
Check the presence and functionality of the safety
facilities.
daily
2
Check the lube lines and connections for
mechanical integrity and leakage.
monthly
3
Check the pump units and components for
mechanical integrity and leakage.
weekly
4
Check the filling level of the pump unit
weekly
8.4
Repair
For repairs, turn to WOERNER, please.
8.5
List of spare parts
See data sheet P0655 (GMI-A), P0643 (SAB-C), P0102 (GML-A), E0657 (GOI-A)