wirsbo SetPoint 150 Скачать руководство пользователя страница 1

SetPoint 150 Controller 

Installation Manual

Содержание SetPoint 150

Страница 1: ...SetPoint 150 Controller Installation Manual...

Страница 2: ...stallation Manual is published by Uponor Wirsbo Inc 5925 148th Street West Apple Valley MN 55124 Phone 952 891 2000 Fax 952 891 1409 www wirsbo com 2005 Uponor Wirsbo All rights reserved Second Editio...

Страница 3: ...ction 2 SetPoint 150 Controller Elements 2 Installation 3 Inventory 3 Mounting the SetPoint 150 Controller 3 Rough in Wiring 3 Connecting the Wiring 4 Electrical Connections 4 Sequence of Operation 5...

Страница 4: ...The display indicates a sensor fault when the sensor is open or has a short circuit SetPoint 150 Controller Elements Refer to Figure 2 for an explanation of all the elements on the SetPoint 150 Contro...

Страница 5: ...hen pushing the front cover onto the enclosure until it snaps into place Rough in Wiring All electrical wiring terminates in the two wiring chambers at the bottom front of the controller If the contro...

Страница 6: ...poor wiring connection or a defective sensor If the resistance is very low this may indicate a wiring short moisture in the sensor or a defective sensor To test for a defective sensor measure the resi...

Страница 7: ...pment Consult the manufacturer s operating and installation instructions for advice on recommended time delays Sequence of Operation On Off Mode When the controller is programmed for heat in this mode...

Страница 8: ...mode The controller monitors the temperature at the sensor and displays it in the digital display See Figure 10 Note The control automatically goes back to operating mode when the buttons are left unt...

Страница 9: ...the differential temperature See Figure 15 Differential Range 1 to 40 F 1 to 22 C Pushing the ITEM button again changes the flashing pointer to Delay Push the UP or DOWN arrow buttons to increase or...

Страница 10: ...rrectly check that the settings are correct and that the problem is not due to external causes 3 Ensure all wiring connections are connected properly and the sensor is in the correct location Before L...

Страница 11: ...use only 20 to 122 F 30 to 50 C 90 RH non condensing Power Supply Class II 24VAC 10 1 VA or 32 VDC 20 0 02 A Relay Rating 120VAC 5A hp Pilot duty 240VA 2A Sensor NTC thermistor 10 k 77 F 25 C 0 2 C 3...

Страница 12: ...10 Page 10 is blank...

Страница 13: ...Wiring Diagrams SetPoint 150 Controller Wired to pro Series Controls This electrical drawing shows the connections between the SetPoint 150 Controller and respective pro Series controls Wiring Diagra...

Страница 14: ...troller provides input to the Zone Control Module ZCM and operates the associated Motorized Valve Actuators MVAs on the corresponding terminal connections The sensor S1 can be placed within a concrete...

Страница 15: ...50 Controller Wired to Single zone Pump Relay As shown the SetPoint 150 Controller operates a Single zone Pump Relay A3010100 Place the sensor S1 within a concrete slab or strapped to piping to operat...

Страница 16: ...wn the SetPoint 150 Controller operates a single pump using a Three zone Multi pump Relay A3080301 The sensors S1 can be placed within a concrete slab or strapped to piping in order to operate a pump...

Страница 17: ...15 Notes...

Страница 18: ...16 Notes...

Страница 19: ......

Страница 20: ...www wirsbo com Uponor Wirsbo Inc 5925 148th Street West Apple Valley MN 55124 Tel 800 321 4739 Fax 952 891 1409 www wirsbo com Copyright 2005 Uponor Wirsbo Printed in the United States_SP150MAN_05...

Отзывы: