Table 2-1. Automatic Downtime Inputs Priority
Input
number
Wire to
TB4 pin
Priority
Order
Automatic
Downtime
Reason #
4
4
1 - highest
32
3
3
2
31
2
2
3
30
1
1
4 - lowest
29
Automatic downtime inputs have a set priority. Input 4 has the highest priority, Input 1 the lowest.
When the machine transitions from Running to Idle, SMI 2 detects only the highest priority input that
is ON. SMI 2 ignores any lower-priority inputs.
Example:
If automatic downtime Input 4 is ON and all the other automatic downtime inputs are also ON,
SMI 2 responds only to Input 4. If Input 4 then goes OFF while all the others are still on, SMI 2
responds to Input 3.
Wire input 4 to the equipment that would stop the line first. Wire input 3 to the equipment that would
stop the line next, and so on.
If you use only one of the automatic downtime inputs, use the highest priority input, Input 4. If you
use two of these inputs, use Inputs 4 and 3, and so on.
You can record the wiring connections and downtime reasons in the table below.
Table 2-2. Automatic Downtime Inputs and Reasons
Automatic
Downtime
Input
TB4 Pin
Number
Wired to
Automatic
Downtime
Reason
Number
Automatic Downtime Reason
(Programmed on SFC)
4
4
32
3
3
31
2
2
30
1
1
29
Содержание ShopFloorConnect SMI 2
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 32: ...1146400 SFC Machine Interface SMI 2 Installation Manual 32 Chapter 2 Installation ...
Страница 36: ...1146400 SFC Machine Interface SMI 2 Installation Manual 36 Appendix A SFC Primary Item Discovery ...
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......