Shadow VI User Manual
1107200
Installation and Checkout
Chapter 2
page 49
Table 2-4. Connecting Light Curtain Receiver Head to TB3 in Controller
Set #1 Heads to Upper Level; Set #2 Heads to Lower Level
XMTR TB3
Wire color
Terminal signal
Pin #1
orange
VCR
Pin #2
red
VCC
Pin #3
blue
and
black
GND
Pin #4
brown
SHTD
Pin #5
green
SHTD
Pin #6
yellow
SYNC
Terminate shield to set screw terminal near entry point.
(See “Terminating Shields of the Head Cables,” page 46.)
If You Have a Second Set of Shadow Optic Heads
NOTICE
W HEN USING TWO SETS OF HEADS
•
Carefully label
the transmitter and receiver cables for set #1 and set #2. This will help with
troubleshooting your Shadow installation, if necessary.
•
Run the cables for set #2 in a separate conduit from set #1’s cables.
•
Set Jumper J12 to “2 SETS.” See page 61.
If you have a second set of optic heads, follow the steps in the previous section to connect
the head cables of the second set of heads to the
lower level
of TB2 (receiver 2) and TB3
(transmitter 2) in the control. Run the cables in separate conduits. Refer to Tables 2-3 (for
receiver) and 2-4 (for transmitter).
Set Jumper J12 to “2 SETS.” This enables operation of the second set of heads. See page 61.
Содержание Shadow VI
Страница 142: ...1107200 Shadow VI User Manual page 130 Appendix C Installation of Shadow VI WPC Control Board ...
Страница 144: ...1107200 Shadow VI User Manual page 132 Appendix D Replacement Parts ...
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......