Maintenance
2124
−
2/A1
Winterthur Gas & Diesel Ltd.
2.
Cylinder Liner
−
Removal
2.1
Lifting Tool
−
Install
1) Connect the crane hook to the shackle
(94202I, Fig. 1) on the lifting tool
(94202).
2) Use the engine room crane to put the
lifting tool (94202) in position on top of
the cylinder liner (1).
Note: The special screws (3) are installed
in the storage position (2) in the
holder (94201B).
3) Apply copper paste to the threads of
special screws (3).
4) Attach the two holders (94206) to the
cylinder liner (1) with the special
screws (3).
5) Torque the special screws (3) to
120 Nm.
2.2
Cylinder Liner
−
Lift
1) Connect the crane hook to the shackle
(94202I) on the lifting tool (94202,
Fig. 2).
2) Operate the engine room crane to
carefully lift the cylinder liner (1).
3) Move the cylinder liner (1) over the rail
unit (2).
4) Lower the cylinder liner (1) on to a
suitable wooden underlay. Refer to
2017
Cylinder Liner
−
Removal and Installation
1
I
I
I - I
2
94206
3
94202
94201I
94202
WCH03611
Fig. 1
WCH03611
94201I
WCH03613
Fig. 2
94202
1
2
Содержание X35-B
Страница 12: ...Intentionally blank ...
Страница 14: ...Intentionally blank ...
Страница 16: ...Intentionally blank ...
Страница 34: ...Intentionally blank ...
Страница 58: ...Intentionally blank ...
Страница 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Страница 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Страница 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Страница 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Страница 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Страница 68: ...Intentionally blank ...
Страница 72: ...Intentionally blank ...
Страница 82: ...Intentionally blank ...
Страница 85: ...Intentionally blank ...
Страница 92: ...Intentionally blank ...
Страница 96: ...Intentionally blank ...
Страница 112: ...Intentionally blank ...
Страница 120: ...Intentionally blank ...
Страница 124: ...Intentionally blank ...
Страница 138: ...Intentionally blank ...
Страница 154: ...Intentionally blank ...
Страница 168: ...Intentionally blank ...
Страница 180: ...Intentionally blank ...
Страница 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Страница 186: ...Intentionally blank ...
Страница 190: ......
Страница 204: ...Intentionally blank ...
Страница 211: ...Intentionally blank ...
Страница 216: ...Intentionally blank ...
Страница 224: ...Intentionally blank ...
Страница 228: ......
Страница 229: ...Intentionally blank ...
Страница 264: ...Intentionally blank ...
Страница 270: ...Intentionally blank ...
Страница 280: ...Intentionally blank ...
Страница 294: ...Intentionally blank ...
Страница 298: ...Intentionally blank ...
Страница 302: ...Intentionally blank ...
Страница 318: ...Intentionally blank ...
Страница 328: ...Intentionally blank ...
Страница 344: ...Intentionally blank ...
Страница 368: ...Intentionally blank ...
Страница 374: ...Intentionally blank ...
Страница 380: ...Intentionally blank ...
Страница 396: ...Intentionally blank ...
Страница 407: ...Intentionally blank ...
Страница 426: ...Intentionally blank ...
Страница 442: ...Intentionally blank ...
Страница 444: ...Intentionally blank ...
Страница 546: ...Woodward L Orange GmbH Porschestraße 8 D 70435 Stuttgart Tel 49 711 82609 0 Fax 49 711 82609 61 www lorange com ...