7
- Check that the bed operates properly after installing it in accordance with the check-list
appended in this document. (Test all of its functions)
- The patient is a planned operator of the bed. Users must be trained in how to use the
equipment.
- Inform the patient and his visitors of the safety instructions to be observed.
Brake the wheels.
The mains socket should remain accessible to enable the bed to be disconnected quickly.
Plug in the power lead, checking that the mains comply with the standards in force and that it is suitable for the
supply box voltage.
Also ensure that the power lead, the remote control lead as well as the cables of possible other devices are
positioned correctly to prevent any risks of getting caught between the moving parts of the bed.
3.4. Electrical characteristics
3.4.1. Electrical data
Classe II (double
insulation)
Frequency
Protection level against
dust and liquid penetration
Operating time
In accordance with DEEE
Internal reference
Voltage
Current type
XXX-XXX-XXX
IP XX
xxxV ~ xxH
Z
FACTEUR DE SERVICE :
xx% max. x min/xx min
PUISSANCE ABSORBEE :
Xxx VA
ET-xxxxx
Protection level against
electric shocks (type BF)
Absorbed power
Internal reference
Содержание PITCHOUNE KALIN
Страница 23: ...23 5 6 8 7...
Страница 25: ...25 To lower the side rail 1 l Lift the upper bar 2 Press the locking buttons of each panel 2 1...
Страница 35: ...35...
Страница 36: ...36...