![WinGD X82-B Скачать руководство пользователя страница 652](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581652.webp)
Fig 11-12 Auxiliary blower (driving end) move
2.17
) to the strut (001).
2.18
Attach the spur-geared chain block (003) to the shackle (002) and the two slings
(007).
2.19
Operate the chain blocks (002, 010) to move the electric motor (006) into the
casing.
2.20
Attach the electric motor (006) to the flange (004) with the bolts.
2.21
Attach the electric motor (006) to the support (005) with the bolts.
2.22
Connect the electrical connection to the electric motor (006).
X82-B
AA00-6545-00AAA-720A-A
Maintenance Manual
Auxiliary blower - install
Winterthur Gas & Diesel Ltd.
- 652 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...