![WinGD X82-B Скачать руководство пользователя страница 626](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581626.webp)
10.8.4
Exhaust valve control unit (VCU) - install
Periodicity
Description
Working hours
36 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
AR
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
Oil
A/R
Spare Parts
Description
Part No.
CSN
QTY
Exhaust valve control unit
1
Piston joint ring
1
SAFETY PRECAUTIONS
CAUTION
Injury Hazard. Use applicable lifting equipment to lift and move the exhaust valve control
unit.
PRELIMINARY OPERATIONS
•
The exhaust valve control unit must be assembled, refer to
X82-B
AA00-5612-00AAA-720A-A
Maintenance Manual
Exhaust valve control unit (VCU) - install
Winterthur Gas & Diesel Ltd.
- 626 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...