![WinGD X82-B Скачать руководство пользователя страница 614](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581614.webp)
10.7.5
Supply unit bearing bush - install
Periodicity
Description
Working hours
90 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
oil
A/R
Spare Parts
Description
Part No.
CSN
QTY
O-ring
1
bearing bushes
2
pinion
1
shaft
1
SAFETY PRECAUTIONS
CAUTION
The weight of the pinion and shaft is 55 kg. Make sure that you use the correct
equipment and sufficient personnel to lift and move the pinion and shaft. This will
prevent injury to personnel.
PRELIMINARY OPERATIONS
•
None
X82-B
AA00-5581-02AAA-720A-A
Maintenance Manual
Supply unit bearing bush - install
Winterthur Gas & Diesel Ltd.
- 614 -
Issue 001 2020-10
Содержание X82-B
Страница 10: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 001 2020 10...
Страница 199: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 199 Issue 001 2020 10...
Страница 335: ...X82 B Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 335 Issue 001 2020 10...
Страница 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Страница 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Страница 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Страница 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Страница 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Страница 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Страница 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Страница 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Страница 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...