WINAM PLAY GS-W5002 Скачать руководство пользователя страница 1

INSTALLATION & MAINTENANCE INSTRUCTIONS

Ages: 6 to 12 years
Capacity: 17 children
Size: D: 24' 7" / 7. 50m 

H: 4' 11" / 1. 50m

Use zone: D: 34' 5" / 10. 50m                                                                             

Figure-1:

Completed Net

Features

The GS-W5002 features

GS Web technology

which includes 

the highest steel content and the strongest connection materials 
in the industry, including a steel-wire core in our edge ropes 
and connection points crushed in place with over 75 tons 
of preasure to ensure long life of the games and maximum 
safety for the children.

GS Web Nets help bring movement, balance, 
exercise and fun back into the playground.

WINAM GROUP

The series is a specialty climbing structure featuring 
a flexible center area surrounded by netting. It is made of 
steel-loaded Nylon cables with UV guard and the landing 
surface is a textile-reinforced flexible rubber material. 

NET JUMPER

MODEL NO.

GS-W5002

WINAM GROUP

E-mail) [email protected]

Tel) (028) 22 494 333

Web site) www.playground.com.vn

Room  101,  226/4A  Le  Trong  Tan, Tay  Thanh  

ward,  Tan  Phu  district, Ho Chi Minh city, Viet Nam

Содержание PLAY GS-W5002

Страница 1: ...preasure to ensure long life of the games and maximum safety for the children GS Web Nets help bring movement balance exercise and fun back into the playground WINAM GROUP The series is a specialty cl...

Страница 2: ...than 72 in 1830mm from all sides of the play structure Fall Height 1500mm from surface The Fall height on the extennal surface of a pyramid shaped space net is the highest point attainable on the edge...

Страница 3: ...n dimensions Figure 4 Excavate enough materials to allow for proper depth of concrete footings Also ensure that there is enough space to allow the frame to be positioned properly Anchor wood support f...

Страница 4: ...Layout Note Total distance from front of block to front of block is 11 5 3 4 3500mm Metric Imperial conversion 1750mm 5 8 7 8 3500mm 11 5 3 4 3750mm 12 3 5 8 7500mm 24 7 1 4 Metric Imperial conversio...

Страница 5: ...g to subgrade level Figure 6 Concrete footing Assemble wooden support frames 4 frames 78 3 4 2000mm L x 23 2 3 600mm W x 19 2 3 500mm H Use min plywood not included in package NOTE Use anchor plate as...

Страница 6: ...ean threads of L anchor bolts Attach Anchor plate to footing Metric Imperial conversion 350mm 1 1 3 4 700mm 2 3 1 2 950mm 3 1 1 2 1850mm 6 0 7 8 2100mm 6 10 3 4 3050mm 10 3650mm 11 11 3 4 WINAM GROUP...

Страница 7: ...shown in Figure 9 Step 2 Attach Turnbuckle to anchor plate with M22 X L110 H T BOLT Loosen Turnbuckle all the way about 100mm leaving only 4 or 5 threads attached Main Post Plate Anchor Plate WINAM G...

Страница 8: ...P 3 Post assembly Step 3 Attach Post Cap to Post Figure 10 Step 4 Attach Post to Post base with M22 X L80 H T BOLT Figure 11 A B C B C M22 X L80 H T BOLT A B STEP 4 WINAM GROUP WINAM GROUP E mail info...

Страница 9: ...at the Same time Tighten Rope with Turnbuckles at the Same time a a c c NOTE Make sure post is level before tightening and remains level during process b c c Tighten Rope with Turnbuckles at the Same...

Страница 10: ...ed as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA and TUV maintance system After Net structure tension is completed the net will stretch slightly o...

Страница 11: ...Main Post Plate 6 H T bolt nut washer for Anchor Plate 7 Main Post Plate 8 Anchor plate 9 L anchor bolt nut washer 1 2 9 5 8 6 4 7 3 WINAM GROUP WINAM GROUP E mail info playground com vn Tel 028 22 49...

Страница 12: ...e that no acts of vandalism have damaged the rope Periodic checks on tension will assist in the durability of the product WINAM GROUP WINAM GROUP E mail info playground com vn Tel 028 22 494 333 Web s...

Страница 13: ...obilization or removal There should be written operational procedures covering the measures to be taken in the event of accidents fire and the like Until unsafe equipment is repaired and released for...

Страница 14: ...l finished surface level f cleaning g removal of broken glass and other debris or contaminants h restoring loose fills to the correct level and i maintenance of free space areas D Corrective maintenan...

Отзывы: