Service
Servicing requires extreme care and knowledge and should be performed only by a qualified service
technician. For service we suggest you to return the product to your nearest
authorized service cen-
tre
for repair.
WARNING!
To avoid serious personal injury, do not attempt to use this product until you read thoroughly
and understand the operator’s manual completely. Save this operator’s manual and review fre-
quently for continuing safe operation and instructing others who may use this product.
Packing list
1x HPHD52 Engine Assembly
1x 150mm Auger Bit
1x 200mm Auger Bit
1x 300mm Extension Shaft
3x Gudgeon Pins with Cotter pins
1x Spark Plug/Engine Tool
2x Spanners
2x Allen Keys
1x 76ml 2 Stroke Synthetic Oil
1x 50:1 Fuel Mixture Bottle
1x Operators Manual
Features / Specifications
KNOW YOUR POST HOLE DIGGER
See Figure 1&2 (All figures are attached at the end of this manual)
The safe use of this product requires an understanding of the information on the product and in this
operator’s manual as well as knowledge of the project you are attempting. Before use of this project,
familiarize yourself with all operating features and safety rules.
AIRBOX
The airbox cover houses the air filter which helps to limit the amount of dirt and dust drawn into the
unit during operation.
CHOKE LEVER
The choke lever is used when starting the engine.
DRIVESHAFT
The driveshaft is connected to attachments to transfer movement.
ENGINE SWITCH
The engine switch is used in combination with the recoil starter grip to start the engine. It is also used
to turn the engine off.
© by WilTec Wildanger Technik GmbH
Seite 31
http://www.WilTec.de
http://www.aoyue.eu
http://www.teichtip.de