Installation and operating instructions • Wilo-DrainLift BOX • Ed.06/2022-10
37
5.3
Storage
CAUTION
Total damage due to moisture ingress
The ingress of moisture into the connection cable damages the cable and
the pump! Never immerse the ends of the connection cable in fluid. Seal
them tightly during storage.
•
Place the lifting unit securely on a firm surface and secure it against slipping and falling
over!
•
Storage conditions:
–
Maximum: -15 to +60 °C (5 to 140 °F), max. humidity: 90 %, non-condensing.
–
Recommended: 5 to 25 °C (41 to 77 °F), relative humidity: 40 to 50 %.
•
Drain the collection reservoir completely.
•
Coil the connection cable and attach to the lifting unit.
•
Remove the existing switchgear and store it according to the manufacturer’s instruc-
tions.
•
Tightly seal all open pipe sockets. Attach the chamber cover and close the floor drain.
•
Do not store the lifting unit in spaces where welding work is carried out. The resulting
gases or radiation can corrode the elastomer parts.
•
Protect the lifting unit from direct exposure to sunlight. Extreme heat can damage the
tank and the built-in pumps!
6
Installation and electrical con-
nection
6.1
Personnel qualifications
•
Electrical work: qualified electrician
Person with appropriate technical training, knowledge and experience who can identify
and prevent electrical hazards.
•
Installation/dismantling work: trained specialist in plant technology for sanitary facilities
Fixation and buoyancy safeguards, connection of plastic pipes
6.2
Installation types
•
Inside buildings
The following installation types are
not
permitted:
•
Outside buildings
6.3
Operator responsibilities
•
Observe locally applicable accident prevention and safety regulations.
•
Observe all regulations for working under suspended loads when using lifting equip-
ment.
•
Provide protective equipment. Ensure that the protective equipment is worn by person-
nel.
•
Ensure free access to the installation location.
•
Carry out the installation work according to locally applicable regulations.
•
Check that the available consulting documents (installation plans, installation location,
inflow conditions) are complete and accurate.
•
Lay and prepare the pipes according to the consulting documents.
•
Mains connection is overflow-proof.
6.4
Installation
CAUTION
Material damage due to incorrect transport!
It is not possible to transport and to position the lifting unit alone. There
is a risk of material damage to the lifting unit! Always transport the lifting
unit and align it at the installation location with two persons.
•
Wear protective equipment! Observe the work regulations.
–
Protective gloves: 4X42C (uvex C500 wet)
–
Safety shoes: Protection class S1 (uvex 1 sport S1)
•
Prepare the installation site:
–
Clean, free of coarse solids
–
Dry
Содержание DrainLift BOX
Страница 2: ...DrainLift BOX https qr wilo com 742...
Страница 3: ...3 Chinese 4 English 26...
Страница 5: ...zh CHS Wilo DrainLift BOX Ed 06 2022 10 5 1 1 1 1 2 WILO SE 2022 1 3 Wilo 1 4 Wilo 2 2 1...
Страница 6: ...zh CHS 6 Wilo DrainLift BOX Ed 06 2022 10 1 2 2...
Страница 7: ...zh CHS Wilo DrainLift BOX Ed 06 2022 10 7 EN 12056 16 18 2 3 2 4 RCD RCD RCD 2 5 50 kg 110 lbs 2 2 6...
Страница 8: ...zh CHS 8 Wilo DrainLift BOX Ed 06 2022 10 2 7 2 8 2 9 3 3 1 DIN EN 12050 EN 12050 2...
Страница 25: ...zh CHS Wilo DrainLift BOX Ed 06 2022 10 25 8 9 10 11 12 13 14 15 16 17 12 13 13 1 13 2 www wilo recycling com...
Страница 51: ......