background image

 

Date: 2016-June-26  

 

 

 

 

   

www.williams-sonoma.com

 

 

 

         

               

Page 1 of 7 

Rev:

     

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 

SAUSALITO KITCHEN ISLAND

 

 
 
 
 
 

Содержание SAUSALITO KITCHEN ISLAND

Страница 1: ...Date 2016 June 26 www williams sonoma com Page 1 of 7 Rev SAUSALITO KITCHEN ISLAND...

Страница 2: ...work surface Do not dispose of any packaging or contents of the shipping carton until assembly is completed to avoid accidentally discarding small parts or hardware Use the parts and hardware lists b...

Страница 3: ...o remove the drawer 2 Open the Side Door of the Base Frame B 3 Attach the left and right Side Panel C D to the Base Frame B Note Align side panel holes with holes in base frame 4 Insert 8 sets of Alle...

Страница 4: ...seated flat on the ground If it is not level and it rocks adjust the levelers in or out until the cabinet sits firmly and level on the floor Note The base must be leveled before assembling the Marble...

Страница 5: ...Rev 9 Attach the Base Frame B to the Marble Top A using insert 4 sets of Allen Bolt 2 Spring Washer 4 and Flat Washer 5 from the interior of the left and right side panels and into the pre installed...

Страница 6: ...the inside of the Door and into the Knobs Diagram BB C Tighten the Machine Screws using a Philips Head Screwdriver not included 11 To assemble the Knobs to the Drawers follow these below steps A Remov...

Страница 7: ...ctions Always use a chopping board on the Marble Top to prevent any scratching Refrain from dropping heavy objects on the marble top Dust often using a clean soft dry and lint free cloth Blot spills i...

Отзывы: