Commissioning
Wieland Electric GmbH | BA001298 | 09/2022 (Rev. A)
15
9
COMMISSIONING
All international, national and regional guidelines, standards, safety instructions and safety regula-
tions must be observed throughout the entire life cycle of the product.
Once the system has been mounted and installed correctly, a qualified electrician must test and ap-
prove the system for operation.
Distribution boxes with electronic components may require commissioning and configuration. The
necessary manuals are enclosed with the distribution box and can be found on the manufacturer's
homepage.
During installation and commissioning, you must make sure that the necessary EMC directives are
complied with.
For further details on the mechanical or electrical data, see the enclosed documentation in the
scope of delivery or at
https://eshop.wieland-electric.com.