background image

Содержание MK110

Страница 1: ... AS A RANGE COOKTOP OR OTHER HEAT PRODUCING APPLIANCE Kit consists of 1 Wall Bracket 1 I Bracket L H 1 I Bracket R H 1 Shelt Pan 10 316 Sheet Metal Screws 2 l 4 x 2 Lag Screws 3 l 4 x 3 Toggle Bolts 3 l 4 Toggle Bolt Heads 1 Installation Instructions Recommended Installation Tools l Carpenter s Square or Level l Pencil l Phillips Screwdriver No 2 l Satety Glasses l Adjustable Wrench or 3 6 Wrench ...

Страница 2: ...nd local codes and ordinances If a mating wall receptacle is not available it is the personal responsibility and obligation of the customer to have a properly polarized and grounded 3 prong wall receptacle installed by a qualified electrician See Figure 1 POWER SUPPLY CORD GROUMOIYG PLUG REQUIREMENTS j 5 WALL CONSTRUCTION l The mounting system should be mounted against and supported by a flat vert...

Страница 3: ...ttom of LOWEST POINT OFOVERHEAD CABINET 1 7 MIN 1 INSTALLATION DIMENSIONS FIGURE5 5 Confirm holes are level then drill 3116 holes at location A and 8 If you hit a stud use l 4 x 2 lag screws If you hit drywall only redrill 314 diameter hole s and use toggle bolt s 6 Mount the wall bracket using lag screw s and or toggle bolt s and secure to wall See Figure 6 The toggle bolts are used by inserting ...

Страница 4: ...rews installed in Step 10 See Figures 7 and 8 12 Drill 3 l 6 hole at location C If you hit a stud use a l 4 x 2 lag screw If you hit dry wall only redrill 3 4 diameter hole and use toggle bolt at hole location C 13 Insert toggle bolt into shelf pan if required 14 Reinstall shelf assembly to wall bracket Secure each L bracket to the wall bracket with two 318 sheet metal screws See Figure 8 15 Tight...

Отзывы: