Installation Guide
5. Installation
5.2 Ultrastar Data102 Installation Procedure
Figure 46:
Shipping Bracket Screw Locations (CMA Standard)
Figure 47:
Shipping Bracket Screw Locations (CMA Lite)
Step 25 :
Plug the enclosure power cords into a PDU to power the enclosure.
Step 26 :
Double check the power indicators and other LEDs to ensure that the system is booting.
5.2.1
Special Considerations for Cable Routing
There are a number of special considerations installers should take when routing cables through the CMA.
This section outlines those considerations.
The distance from the end of the connector at the port to the first basket on the CMA should be 20” – 21”
long. This will give the cables enough slack at this end to prevent stress on the port and binding during
operation cycles.