User Guide
3. Support
3.8 Rails Replacement
Figure 108:
Shipping Bracket Screw Locations (CMA Lite)
Step 31 :
Plug the enclosure power cords into a PDU to power the enclosure.
Step 32 :
Double check the power indicators and other LEDs to ensure that the system is booting.
3.8
Rails Replacement
Replacement Requirements
Personnel Required
3 Total (2 for Team
Lifting Purposes and
1 to Guide and Spot)
Avg. Replacement Time
~1 hr
Max Replacement Time
N/A
Tool
Required vs. Recommended
Long T15 Torx Screwdriver
Required
# 2 Philips Screwdriver
Required
Long T10 Torx Screwdriver
Recommended
Cable Ties (for configurations with greater than 10 total cables)
Recommended
Tape measure
Recommeded
Level
Recommeded
Option 1:
M5 x 12mm T15 Flat Head Torx screws with washers
Option 2
: Toolless screwplate
Required
Low-Profile M4 x 3.2mm Philips
screws (included with rail assembly)
Required
106
Содержание 1EX1231
Страница 1: ...User Guide Ultrastar Data102 Regulatory Model H4102 J Document D018 000226 000 Revision 04 May 2022...
Страница 16: ...User Guide Points of Contact xv...
Страница 110: ...User Guide 3 Support 3 7 CMA Replacement Figure 91 CMA Cable Routing c Open all of the baskets Figure 92 Open Baskets 94...