33. Attach the Preacher Pad (13) to the Preacher
Post (14) with two M6 x 16mm Screws (67).
33
13
14
32. Attach the Shroud (89) to the bracket on the Top
Frame (4) with two M6 x 16mm Screw (67) and
two M6 Washers (63).
Attach the Shroud (89) to the bracket on the Base
(1) with two M6 x 16mm Screws (67) and two M6
Washers (63).
32
4
67
67
89
63
63
67
63
67
63
1
67
35. Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in
ADJUSTMENTS, beginning on the following page.
Before using the weight system, pull each cable a few times to be sure that the cables move smoothly over
the pulleys. If one of the cables does not move smoothly, find and correct the problem.
IMPORTANT: If the
cables are not properly installed, they may be damaged when heavy weight is used. See the CABLE
DIAGRAM on page 19 of this manual for proper cable routing. If there is any slack in the cables, you
will need to remove it by tightening the cables; see TROUBLESHOOTING AND MAINTENANCE on
page 20.
15
34. Slide two Handgrips (31) onto the ends of the Lat
Bar (32).
34
31
31
32