5
Place all parts of the exercise cycle in a cleared area and remove the packing materials. Do not dispose of the
packing materials until assembly is completed.
Assembly requires the included hex key
and your own adjustable spanner
,
phillips screwdriver
, and pliers
.
1. Hold one of the Stabilisers (2) against the bracket
on the rear of the Frame (1);
make sure that the
indicated square holes are facing away from
the bracket.
Attach the Stabiliser with two 3/8” x
65mm Carriage Bolts (5) and two 3/8” Nylon
Locknuts (7).
If there are no Stabiliser Caps (3) on the Stabiliser
(2), press a Stabiliser Cap onto each end.
Attach the other Stabiliser (not shown) to the
front of the Frame (1) in the same way.
1
2
3
5
Square
Hole
7
7
1
3
ASSEMBLY
2. Whilst another person holds the Upright (19) near
the front of the Frame (1), connect the Extension
Wire (16) to the Reed Switch Wire (17). Next, con-
nect the Resistance Cable (13) to the Lower Cable
(14) in the following way:
• See inset drawing A. Pull up on the metal brack-
et (A) on the Lower Cable (14), and insert the tip
of the console cable (B) into the wire clip inside
of the metal bracket.
• See inset drawing B.
Firmly
pull the console
cable (B) and slide it into the metal bracket (A)
on the Lower Cable (14) as shown.
• See inset drawing C. Using pliers, squeeze the
prongs on the upper end of the metal bracket (A)
together.
Carefully push the excess wire and cable down
into the Frame (1), and insert the Upright (19) into
the Frame.
Be careful to avoid pinching the
wires and cables.
Next, attach the Upright with
four M8 x 20mm Button Screws (28), four Split
Washers (37), and four Curved Washers (6).
Be careful to
avoid pinching
the wires and
cables during
this step.
A
B
C
14
B
B
A
A
A
14
2
19
13
16
17
14
6
6
6
37
37
28
28
28
1