background image

Add: No. 809 8F A Area, Huameiju   

Business Center, Xinhu Rd, Block   
82 Baoan District Shenzhen, China 
518102

Tel:  +86 755 29193778    400 6088 126
Fax: +86 755 23494915
E- mail:  [email protected]
http://www.wesena.com

Содержание e6V

Страница 1: ...Operator s manual e6v Make life colorful...

Страница 2: ...tion team At the same time we are on the line of providing the high quality products constantly and will never stop innovating and improving the theory of development in HTPC case The products Both OE...

Страница 3: ...Open the Top panel 5 Montherboard installation 5 HDD installation 6 ODD installation 8 PSU installation 9 PCI or PCIE slot installation 9 Close the Top panel 10 Open the card reader door 10 PCB cables...

Страница 4: ...e6V Material 100 full Aluminum Color Silver black Gold VFD screen an VFD screen Motherboard Mini ITX Micro ATX HDD drive bay 1X3 5 2X3 5 HDD drive bay ODD drive bay 1 5 2 standard optical drive Coolin...

Страница 5: ...d open plate and take out the cover plate Shown as photos Motherboard installment Take off 6 ODD stents screws and take out the ODD holder Put I O baffle plate firstly Put motherboard lock screw secon...

Страница 6: ...nt Unload the HDD holder screws and take out the HDD holder Put 2 5inch HDD first and then alignment lock screws holes To put the holder with 2 5inch HDD into the right place of case lock screws Shown...

Страница 7: ...ad lock it to the both side of the HDD shown as the photo pay attention to the install way of anti vibration pad After locked the screws in both side of HDD and then put the HDD into the bracket shown...

Страница 8: ...DD into the ODD bracket alignment holes and lock screws Shown as the photo To put the ODD button into the cases To put the holders which have been put ODD into the case alignment holes and lock the 6...

Страница 9: ...into the case alignment the hole and lock the screws Shown as photos 9 PCI or PCIE expand installment To exit the baffle plate screws first and then take out the baffle plate Put the PCI or PCIE expan...

Страница 10: ...tion and connections again after finished the inner installment cover the plate lastly Shown as the photos press top right corner of the card reader door to open the card reader door Shown as photos 1...

Страница 11: ...GA H55N USB3 motherboard For example USB USB USB F panel F panel Cables connect sketch map 9 1 9 1 VFD Front 24 3 pin PWR EXT Cable 11...

Страница 12: ...Add No 809 8F A Area Huameiju Business Center Xinhu Rd Block 82 Baoan District Shenzhen China 518102 Tel 86 755 29193778 400 6088 126 Fax 86 755 23494915 E mail info wesena com http www wesena com...

Отзывы: