GRANUDOS 45/100 PLUS V70 Touch
Index: 03
Change date: 25.04.2018
Operating instructions no.: BA SW 001-03 Granudos 45-100 PL V70T.docx
Page 44 of 92
4.
Only increase the pressure until constant flow is established
through the opened dosing lines!
5.
The function of the pressure retention valve must be
checked. Close all ball valves in the dosing lines to simulate
the situation that no valve is addressed!
6.
When all valves are closed, a water
jet of at least 1.5cm thickness must
flow from the reflux line in the tank!
ATTENTION !
A wrongly set pressure reten-
tion valve can destroy the pump.
7.
The total flow through the dosing lines must always be lower than the maximum
filling performance of the GRANUDOS PLUS! It means the GRANUDOS PLUS
must still slowly fill up the tank at full dosing performance.
Hint !
The buffer tank must still fill up slowly at the dosing performances
set and with open control valves. The filling performance of the
GRANUDOS PLUS can reach up to 1200l/h.
5.2.10
Calculation of the dosing line flow performance
The maximum chlorine dosing quantity is specified on the name plate. Calcium
hypochlorite of 70% concentration is assumed. This value is required to calculate
the different flow quantities required for the dosing lines to the different swimming
pools.
The flow quantity to be set for the dosing line to a basin is determined from the
chlorine dosing performance required and the chlorine concentration of the dosing
solution. The concentration is determined at a flow quantity of approx. 1000l/h in
the GRANUDOS PLUS dosing system.