20
Initial Start-Up
5.5 Diagnostics
Conduct in case of fault:
NOTE:
• Shut down the machine.
• With the help of the diagnostics information, analyze and eliminate the cause of error.
• If the error cannot be eliminated, please contact wenglor’s support department.
• Do not operate in case of indeterminate malfunctioning.
• The machine must be shut down if the error cannot be unequivocally clarified or reliably
eliminated.
DANGER!
Risk of personal injury or property damage in case of non-compliance!
The system’s safety function is disabled. Personal injury and damage to equipment.
• Conduct in case of fault as specified..
6. Initial Start-Up
Project engineering, installation, initial start-up, maintenance and testing of the devices may only be carried
out by electricians with recognized training, who are familiar with safety standards for automation technology.
All cables and accessories installed to the setup must comply with applicable safety and electromagnetic
compatibility requirements and regulations, and if applicable correspond with any telecommunication terminal
devices and their specifications. If damage has occurred, the product may no longer be used. The guarantee
and any liability claims against the manufacturer are rendered null and void in the event of improper use.
Information regarding which cables and accessories are approved for installation is available from
www.wenglor.com or is included in this manual.
Содержание EtherCAT ZAI02CN0x
Страница 28: ...28 Web Based Configuration...