66
Appendix
12. Appendix
12.1 List of Changes to Operating Instructions
Version
Date
Description/change
Associated software
version
1.0.0
12
th
September 2017
Initial version of the ope-
rating instructions
12.2 Check list for initial start-up
• This checklist is intended to provide assistance during initial start-up.
• This check list does not replace the checks before intitial start-up as well as the regular checks on the part
of specialized personnel
1. Standards and guidelines; selecting the ESPE
Are the safety rules for the machine based on applicable standards and guidelines?
Yes
No
Yes
No
Yes
No
2. Safety clearance
Was the safety clearance calculated according to applicable standards?
Yes
No
Содержание CSHH001
Страница 5: ...5 1D 2D Handheld Scanners...