3.
Cold pipe and hot pipe connection
Cold and hot pipes are high press reticulated pipe, please connect connectors according to the signs on the
end of the pipe. (Note: Must install a valve on the cold and hot pipe, respectively.)
4.
Power Connection
Connect the power wire to an all-pole
disconnected RCD and keep it from any water.
Please pay attention to the Yellow- Earth Wire
(Equal Potential Wire) on the stainless-steel
support, it must be firmly connected to the Earth
Wire in the Users' house.
5.
Clean, Check and Test
After finishing the above procedures, please clean up the bathtub and remove all the dirt (Turn on the drainage
and clean up the bathtub with water). Then, turn off the drainage, switch-on the waterfall intake, check if there
is any leakage in the bathtub. When water reaches up to the water le vel detector, press 0 button to start the
water pump and check every function of the product.
Drainage usage
When the water in the bathtub overflows the middle of the drainage
valve, the surplus water will flow out through the hole in the drainage
valve. Please pay attention to the pictures. When using the bathtub, the
drainage is tuned off and the side with the hole is downward.
Stainless steel support
Equal
Potential Terminal
Yellow•Green Earth
Wire
(Equal Potential Wire)
C
lo
ckwise
mo
v
ing
drainage
va
l
ve
Drainage
valve
Counter
-cloc
k
wise
moving
drainage
valve
Содержание 61-091001
Страница 6: ...Function Description for Computer Control Panel...
Страница 8: ...Repairing Tips...
Страница 9: ...Connection Blueprint for AA 07HFC Computer Control Massage Bathtub...
Страница 10: ...6 kw electric heater with pressure switch relay box...
Страница 11: ...Measure sketches Bathtub 61 091001 Bathtub 61 091003...
Страница 12: ...Bathtub 61 091002 Bathtub 61 091004...
Страница 13: ...Dealer Bathtub 61 091005...