Service Manual
Disassembly and reassembly
39
REASSEMBLY:
When reconnecting the ECG cable, be certain that the cable leads are perpendicular to
the board and to the ZIF connector before you lock the connector clips.
8.
Disconnect the SpO
2
(flex) cable from connector J3 on the back of the main board.
9.
Disconnect the tubing section at the point shown here:
10. Disconnect the power switch cable from connector J2 on the back of the main board.
SpO
2
flex cable
J3 (SpO
2
)
J1 (ECG)
ECG flex cable
Disconnect the tubing here
Содержание Propaq LT 802LT0N
Страница 1: ...Propaq LT Vital Signs Monitor Service Manual Software version 1 5X or later ...
Страница 4: ...iv Contents Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 8: ...4 Safety summary Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 28: ...24 Troubleshooting and repair Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 74: ...70 Functional verification Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 78: ...74 35 ml test volume Welch Allyn Propaq LT Vital Signs Monitor ...