Installation

5.1 Safety during installation

5

5

Installation

5.1

Safety during installation

Particularly ensure that:

only authorised persons are in the work area and that no other persons are endange-
red by the assembly work.

no components are damaged and are only installed in a clean, functional condition.

all components are installed according to the described instructions.

specified starting torques are adhered to.

the key aspect of the structural components is taken into consideration.

The direction of rotation indicated by an arrow on the motor is taken into account 
when connecting the supply voltage.

5.2

Installation prerequisites

Check prior to installation whether the dimensions of the installation site and building 
conditions correspond to the necessary prerequisites and measurement specification in 
the drawing documents.

Particularly ensure that:

The supporting floor is level and rigid.

The dimensions of the supporting structure at the installation location must be suf-
ficient to withstand the dynamic forces that occur.

The drives for carrying out maintenance tasks are easily accessible and the motor 
ventilations have a distance of at least 100 mm to other modules.

WARNING

Injuries caused by incorrect installation.
The dimensions of the supporting ground and fastening equipment must sufficient, so that 
they can withstand the stresses produced during operation.
Auxiliary personnel may only perform work which is assigned to them by plant techni-
cians.
Electric shock
Improperly executed work on the electrical equipment or touching lines with live voltage 
can cause electrical shocks. Work on the machine's electrical equipment may only be 
carried out by qualified electricians. Make sure there is no voltage in the supply cables 
before connecting them. The connection of the power supply has to be carried out accor-
ding to the circuit diagrams. Serious injuries or death resulting from electric shock.
Missing protection circuit
The design of a suitable controller is the responsibility of the vendor or the operating 
company. An RCD needs to be installed between the supply mains and drive regulator in 
the design of the controller.
Incorrect shielding
If the motor shield is not connected at both ends with PE, then life-threatening voltages 
can occur on the motor shield. Attach the motor shield according to the specifications in 
the drive documentation when connecting the motor cable to a drive. Serious injuries or 
death resulting from electric shock.

Содержание Pick-O-Mat PM1100

Страница 1: ...ASSEMBLY AND INSTRUCTIONS MANUAL PICK O MAT Mechanical system documentation Pick O Mat PM1100 PM1500 ENE 02 2014 PM TD0044A EN00 0000 00...

Страница 2: ...6281 52080 service weiss gmbh de www weiss gmbh de WEISS GmbH All rights in this document are the copyright of WEISS GmbH This document may not be copied or reproduced in whole or in part without the...

Страница 3: ...azards 10 3 Product description 11 3 1 Structure 11 3 2 Function 12 3 2 1 Complete module 12 3 2 2 Lift module 12 3 2 3 Press module 12 3 3 Movement sequence 13 3 4 Crash safety 14 3 5 Technical data...

Страница 4: ...ine 31 7 3 Operating personnel workstations 31 8 Malfunctions 32 8 1 Safety when remedying malfunctions 32 8 2 Errors Cause Remedy 32 8 3 Customer Service 32 9 Maintenance 33 9 1 Safety during mainten...

Страница 5: ...ld be installed is conform with Directive 2006 42 EC and all other applicable directives governing its use Intended use also requires the observance of the included documention and compliance with the...

Страница 6: ...ructions manual will be referred to as manual We reserve the right to undertake modifications because of technical developments to the data and illustrations contained in these instructions The operat...

Страница 7: ...list The book symbol before a section of text indicates further applicable documents L The information symbol before a section of text indicates an additional note or an important tip for use 1 6 4 Fi...

Страница 8: ...al protective clothing is provided for and used by operating mainte nance and repair personnel the operating manual and all other applicable documentation is maintained at all times in legible conditi...

Страница 9: ...he machine when tasks are being per formed supplemental to the operating manual the operating instructions as specified in labour protection legislation and work equipment use legislation are complied...

Страница 10: ...rts from our spare parts list or spare parts we have approved The mounting of ancillary equipment must be coordinated with us Injury of persons due to subsequent damage Impermissible modifications Imp...

Страница 11: ...function of the rotating device refer to the supplied documentation of the respective rotary indexing table Fig 1 Components PM1100 Fig 2 Components PM1500 A Kinematics 1 Handling modules 2 Central d...

Страница 12: ...hecking with the same cycle time The insertion movements can be smooth and harmonic however and ideally run without stop If procedural stops due to faults become necessary then the handling modules ha...

Страница 13: ...cs it is necessary to switch the pneumatic valves already before the bottom dead centre because the dead time of the mechanism is too great at the bottom compared to the dwell time We recommend employ...

Страница 14: ...3 5 1 General technical data 3 5 2 Type plate The type plate is fitted to the housing of the machine and contains the details described in the illustration The illustrated type plate is only an exampl...

Страница 15: ...e insertion modules Of those linear without overlap about 30 mm 40 mm 30 mm 40 mm 25 mm 30 mm 25 mm 30 mm Vertical stroke lift module 58 3 mm 70 mm 58 3 mm 70 mm Vertical stroke press module 40 5 mm 4...

Страница 16: ...Pick O Mat PM1100 PM1500 R02 2014 16 44 Product description 3 5 Technical data 3 3 5 8 Installation positions Approved installation position horizontal Fig 6 Installation positionPM1100 PM1500...

Страница 17: ...1050 0 76 760 20 62 620 20 220 ca 412 ca 1040 363 ca 55 X 16 10 8 0 03 0 02 16 10 14 5 7 10 55 555 69 690 72 725 x Standard dimension other values aviable according to order 121 1210 92 925 25 95 28...

Страница 18: ...hey are not fitted correctly The package unit can tilt slip out of the slings and fall Only lifting equipment with crossbeam trusses should be used The lifting slings should be fitted outside the supp...

Страница 19: ...ts L The three covering screws need to be removed beforehand so that the shackles can be fastened The processing modules may have to be moved aside because they may be partially covering the threads F...

Страница 20: ...sect damage and mould formation by treating chemically Roofed over Protected against rain Not exposed to vibrations Max 3 years with regular inspection of packaging Open Roofed over and sealed at a co...

Страница 21: ...tor ventilations have a distance of at least 100 mm to other modules WARNING Injuries caused by incorrect installation The dimensions of the supporting ground and fastening equipment must sufficient s...

Страница 22: ...e The module needs to be aligned horizontally with the levellers during the setup 5 3 2 Assembly without base body L The Pick o Mat assembly machine is delivered fully assembled mechanically Assembly...

Страница 23: ...be pulled up out of the vertical guide For this the Pick o Mat needs to be in initial position outside top Unpinning and pinning of the gripper rail with the adapter plate is only possible in this di...

Страница 24: ...d in the attached operation manuals Rotary indexing table TC T or TR and Rotary indexing table controller EF xxx Connection of motors and optional EF rotary indexing table controller The following mea...

Страница 25: ...The shunt resistance must be measured and have a value of 10 MOhm The measurement must be recorded in a log The required safety equipment and emergency stop circuits are available and functioning cor...

Страница 26: ...he outside top position of the gripper plate corresponds to the 0 angle of the hand ling cycle In this position the measuring system attached at the bottom end of the curve is also zeroised The follow...

Страница 27: ...ly adjusted along all 3 axes Adjusting the adjustment spindles X and Z 1 Open the nuts at the point clamp 2 Fine adjustment by setting the nuts 3 Tighten nuts Adjusting the radial axis 1 Loosen the fa...

Страница 28: ...in the T slot field so that the holder middle is always aligned towards the machine s middle 4 Tighten fastening screws 5 Tighten the clamp s screw Fig 13 Adjusting the lift module 1 Four fastening sc...

Страница 29: ...crews The lift position can be adjusted radially on the PM1500 press module 1 Loosen the counternuts on the threaded rod 2 Adjust the stroke position turning the threaded rod 3 Tighten counternuts Fig...

Страница 30: ...t has been ascertained that the machine is in a functionally reliable condition and no risk emanates from it during operation A visual inspection of the machine should be conducted prior to re commiss...

Страница 31: ...he operator 7 3 Operating personnel workstations The operating personnel workstations are determined by the operator of the plant or pro duct in which the machine is integrated WARNING Risk of injury...

Страница 32: ...e Description of the malfunction that has occurred Time and attendant circumstances of the malfunction that has occurred Assumed cause You can contact our Customer Service from Monday to Friday betwee...

Страница 33: ...ping All components energized with electrical power should be de energized Extinguished LED s on the servo drive do not mean that all components have been completely de energised Check by measuring to...

Страница 34: ...ions damage to wires and compressed air hoses Excess grease Wipe off excess grease with a soft cloth 9 4 Maintenance 9 4 1 Rotary indexing tables The TC0320T rotary indexing table requires no maintena...

Страница 35: ...oth Lubricating oil according to code CLP32 100 DIN EN 51517 part 3 ISO VG 32 100 Fig 15 Cleaning Lubricating the guides of the central drive 1 Guides The gears of the central drive require no mainten...

Страница 36: ...1517 part 3 ISO VG 32 100 Fig 16 Cleaning the guides in the vertical stroke and horizontal stroke 1 Guides The linear guides in the vertical stroke and in the horizontal stroke need to be greased semi...

Страница 37: ...pressure as minimal as possible 5 Tighten the counternut of the setting screws 6 Tighten fastening screws Fig 18 Adjusting the vertical guide 1 Fixing nut 2 Two fastening screws 3 Counternuts 4 Settin...