Installation and operating instruction
Gas condensing unit WTC-GB 15-B Compact and WTC-GB 25-B Compact
6 Operation
83309302 1/2018-05 La
82-196
6.6.5.4 Screed program
Heating
circuits
Screed
program
CAUTION
Damage to the building structure
It is possible that the screed program on the pump heating circuit could be masked
by other heating circuits or by DHW circuits.
If necessary, deactivate other heating or DHW circuits.
The screed program is used for the drying of underlay flooring and is separated into
two functions. Observe the requirements provided by the speed manufacturer
andEN 1264-4.
Function specific heating
First phase of drying. The function specific heating is used to ensure defect-free
preparation for underfloor heating.
Screed drying
Second phase of drying. Screed drying is used to continue drying ready for floor
covering work.