![Weishaupt WG20 1-C Z-LN Series Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/weishaupt/wg20-1-c-z-ln-series/wg20-1-c-z-ln-series_manual_953344050.webp)
Installation and operating instruction
Gas burner WG40…/1-A ZM-LN
7 Commissioning
83300002 1/2019-02 La
50-128
7.2 Adjusting the burner
7.2.1 Burner without variable speed drive
DANGER
Risk of electric shock
Touching the ignition device can lead to electric shock.
Do not touch ignition device during the ignition process.
Check flame signal during commissioning [ch. 7.1.1].
1. Preset combustion manager
Unplug bridging plug No. 7 on combustion manager.
Switch on voltage supply.
Combustion manager drives to Standby.
Press [G] and [L/A] keys simultaneously.
Combustion manager changes to access level.
Press [+] key.
Combustion manager changes into the setting level for step points.
Press [+] key.
Factory setting operating point P
9
(full load) is displayed.
Press and hold [L/A] key and set air damper setting determined using the [–] or
[+] key [ch. 7.1.6].
Press and hold [G] key using [–] or [+] key set gas butterfly valve to the same
value.
Press [+] key.
Factory setting operating point P
1
(partial load) is displayed.
Содержание WG20 1-C Z-LN Series
Страница 1: ...Installation and operating instruction Gas burner WG40 1 A ZM LN 83300002 1 2019 02 ...
Страница 105: ...Installation and operating instruction Gas burner WG40 1 A ZM LN 12 Project planning 83300002 1 2019 02 La 105 128 ...
Страница 124: ...Installation and operating instruction Gas burner WG40 1 A ZM LN 14 Notes 83300002 1 2019 02 La 124 128 14 Notes ...