LONG PIPING ASSEMBLIES
Most piping assemblies can be treated like other flow line
components - with one SPM
®
FSR Rib installed on each union
connection at each end.
However, on piping assemblies 10 feet
or longer, Weir Oil & Gas requires that a third SPM
®
FSR Rib
also be installed midway between the two union connections
as shown.
This center Rib will not have the union connection to
help prevent it from sliding, however, field testing has shown that
this Rib will help provide extra support should a failure occur.
SWIVEL ASSEMBLIES
Swivel assemblies should have SPM
®
FSR Ribs installed at each of
the following locations:
1. One at each union connection
2. One additional Rib for each additional articulating joint (excluding
the joints adjacent to each union connection).
This will result in the following arrangement:
1. Style 50 Three ribs
2. Style 10 Three ribs
3. Style 100 Four ribs
10’
5’
Содержание SPM Flow Line
Страница 1: ...SPM Flow Line Safety Restraint System FSR Installation Guide...
Страница 32: ...32 Step 2 Step 3 Step 1 SPM FSR Rib...
Страница 41: ...41 NOTES...
Страница 42: ...42 Document P N 2P37221M Release Date 9 25 2014 Revision 6 Date 2 4 2015...