Part number 550-143-010/1021
104
GV90+
series
2
gas-fired water boiler – boiler manual
Figure 110
Multiple GV90+ boilers — ratings and engineering data — maintain the clearances shown on
—
see the figures on
for layout options
Boilers in system
Model GV90+
Total
CSA
input
DOE Heating
capacity
Boiler
H.P.
Net water
ratings
Manifolded
combustion air
duct size
Input,
MBH
Output,
MBH
-
MBH
Square
inches
3
4
5
6
-
Note 1
-
Note 2
Note 3
2
140
130
3.9
112
70
2
210
194
5.8
168
105
2
280
260
7.8
226
140
2
350
322
9.6
280
175
3
210
195
5.8
168
105
3
315
291
8.7
252
158
3
420
390
11.7
339
210
3
525
483
14.4
420
263
4
280
260
7.8
224
140
4
420
388
11.6
336
210
4
560
520
15.5
452
280
4
700
644
19.2
560
350
5
350
325
9.7
280
175
5
525
485
14.5
420
263
5
700
650
19.4
565
350
5
875
805
24
700
438
6
420
390
11.7
336
210
6
630
582
17.4
504
315
6
840
780
23.3
678
420
6
1050
966
28.9
840
525
7
490
455
13.6
392
245
7
735
679
20.3
588
368
7
980
910
27.2
791
490
7
1225
1127
33.7
980
613
8
560
520
15.5
448
280
8
840
776
23.2
672
420
8
1120
1040
31.1
904
560
8
1400
1288
38.5
1120
700
Note 1
Based on standard test procedures outlined by DOE for individual boilers.
Note 2
Net AHRI
ratings are based on piping and pickup allowance of 1.15.
Consult Weil-McLain Technical Services for other allowances.
Note 3
All GV90+ installations require a separate vent pipe and termination for each boiler.
Vent piping cannot be manifolded
. Install and
terminate vents as described in vent/air installation instructions in this manual.
Combustion air piping can be individually piped or manifolded. See
, for manifolded air piping.
Dimensions and ratings
(continued)