Operation and Service Instructions RR/QR/Magnum
File: N:\Bedienungsanleitungen aktuell\Bedienungsanleitungen_Fremdsprachlich\Englisch\Plattenständer
Erstellt 12.09.2013
Page 5 of 11
•
1 x Operation and Maintenance Instructions Manual
5.2 Removing the Transportation Packaging
The slab stand is usually delivered in cardboard packaging.
Before unpacking please compare the attached delivery note with the supplied articles!
Remove the transportation packing:
•
Release the adhesive strips and/or the strapping belts and unpack the contents carefully!
•
Be careful by unpacking the device, in order to prevent damages to the contents!
•
Strong blows to the slab stand on sharp edges can damage the surface protection and/or parts of the assembly!
•
Dispose of the packing wastes for recycling according to the local guidelines!
5.3 Assembly Instructions
The slab stands has to be assembled.
Please read carefully the assembly instruction, in order to use the slab stand in the best way.
Pay attention that the protective coating of the metal parts will not be damaged by sharp edge articles!
Any defects, caused by incorrect assembly and operation are not covered under the
Warranty by the dealer respectively the manufacturer!!
The easy assembly of the slab stands can be performed by means of any ordinary tools:
Features of the ground foundation:
•
Make sure that the ground is absolutely horizontal and even, otherwise the risk of tilting and breakage can occur, caused by
irregular charge!
•
Place the slab stands on a firm ground.
•
Make certain that these features are accomplished, by using a spirit-level or by shaking the slab stands.
•
Make certain that the ground has adequate load capacity!
•
Always adhere to the regulations for the prevention of accidents!
Mounting of the rails:
•
While handling the slab stand always wear the appropriate protective clothing, in accordance with the valid rules for the
prevention of accidents! This includes: Working gloves and working clothes in accordance with the valid regulations and
Safety shoes in accordance with the valid regulations.
•
Place the rails upright, parallel and with a safe distance from each other, directly on the ground (Picture. 4.1)
•
The distance a = b must correspond to the slab width.
•
The closer the top margins of the rails will be to the top edges of the stone slabs, there will be less risk of lateral tilting of the
stone slabs.
Picture 4.1
–
Construction drawing of the perforated rails Example RR
To fasten the Iron tubes:
Place the Iron tubes into the holes, and pay attention to following points:
•
Utilize and install the supplied Iron tubes uniformly onto the two rails (10 / 8 pipes each rails)!
•
Distribute the Iron tubes on the rails, so that the tubes are parallel to each other. It means: If you put the iron tubes in the
holes 1,4,7,10, .. of a rail, consequently you have to put the other pipes in the same holes (1,4,7,10...) of the other rail!
•
Make sure that the tubes are completely inside the holes!
•
Check to see whether all Iron tubes are fully-functional and have no deformations or splits.