Installation and Connection
3-2 | CFW-11W G2
3
Table 3.2:
Cable set items
WEG Item
Cable Set
13555095
2.5 m Cables
13555150
3.0 m Cables
13555151
3.6 m Cables
The panel builder must provide the other parts of the drive. Among those parts are the rectifier, power busbar,
pre-charge circuit, panel fans, protection fuses and input reactance.
3.1.3 Lifting
shows the position of the lifting lugs.
Lifting lugs
Front view
Back view
Figure 3.1:
UP11W G2 lifting lugs
3.1.4 Panel Mounting of the UP11W G2
In order to install the UP11W G2 in panels, the following mounting accessories are necessary:
Rack 2 G2 allows the mounting of 1 or 2 modules side by side in 600 mm wide panels.
Rack 3 G2 allows the mounting of 1, 2 or 3 modules side by side in 800 mm wide panels.
Содержание CFW-11W G2 RB Series
Страница 13: ...General Information 2 6 CFW 11W G2 2 Figure 2 2 Power unit UP11W G2 Figure 2 3 Control unit UC11 G2...
Страница 63: ...Installation and Connection 3 46 CFW 11W G2 3 3 3 3 3 Certification www fs products com...
Страница 83: ...Energization and Start Up 5 14 CFW 11W G2 5...
Страница 99: ...Optional Items and Accessories 7 4 CFW 11W G2 7...