Parts & Service 28/06/2009 902-001-2 Rev 0
6 of 28
Please read this Installation Manual thoroughly before you commence installation of
the I-Lock Coupler. Deviating from these instructions may result in increased install
time and / or damage to the hydraulic kit, carrier machine or attachment.
1.0 CHECK LIST
Before you start check the following
•
Check the contents of the installation kit against the Bill of Materials. Ensure that the kit supplied is
the correct one for the carrier machine that the coupler is to be installed.
•
Check that the carrier machine is positioned on level ground.
•
Check that you have absorbent materials available to soak up any fluid spills. Dispose of any used
materials in a safe and environment friendly manner.
•
Power off the carrier machine. If the machine has been working ensure that it has cooled down
adequately prior to commencing any part of the installation procedure.
•
Before carrying out any welding on the carrier machine disconnect the battery.
Refer to the carrier
machine operator / maintenance manual.
•
Ensure that the pressure in the hydraulic system is relieved before opening any hydraulic lines.
SECTION 1: INSTALLATION GUIDELINES