WECO 5K3 LV/HV
62
3.4.1
Serial Tower Connection #1 Set-Up of the HV Box CAN Communication Loop
Four batteries connected in series is the minimum allowed configuration for High Voltage operation:
CAUTION
:
After setting the DIP switches, the batteries must be restarted for the DIP switch changes to take effect.
Power Cables Connection
COMM Cables Connection
CAN 1-B
LINK-B
LINK-A
LINK-B
CAN 1-A
CAN 1-B
POSITIVE
NEGATIVE
POSITIVE
NEGATIVE
Содержание UNIVERSAL 5K3HV
Страница 70: ...WECO 5K3 LV HV 70 3 6 HV Box ADDRESS...
Страница 75: ...WECO 5K3 LV HV 75...