background image

WE-EF LEUCHTEN

Installation and Maintenance

Instructions 

Inground Luminaire

ETC120-GB LED

Surge Protection

This product features built-in surge protection circuitry in compliance with 

applicable standards.

For comprehensive protection of a luminaire installation against lightning and  

electrical surges, it is essential to cover mains supply and data input lines at  

the distribution board level, by using respective primary (Type 1) and secondary  

(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and activated  

prior to luminaire installation. Also, disconnect luminaires before operating 

high-power devices such as, for example, electrical arc welders.

Содержание ETC120-GB LED

Страница 1: ...ainst lightning and electrical surges it is essential to cover mains supply and data input lines at the distribution board level by using respective primary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operat...

Страница 2: ...1 IP67 Class I ta 25 C Inground Luminaire ETC120 GB 2Sen L o c N 2Sen L o c N Fig I ...

Страница 3: ...odule proceed as follows Fig I a Rotate wheel W using a standard tool in the direction of the open mark until the gimbal module can be pulled out of the luminaire housing b Detach terminal connector Y and remove gimbal module X c Properly package gimbal module X and return to WE EF for factory maintenance Attention During the factory maintenance period ensure both the luminaire cover and lens are ...

Страница 4: ...he shown installation methods In landscape areas soil with gravel base Fig II In paved areas concrete with gravel base Fig III Fig III Fig II Phase One Blockout Installation Procedure during earth or masonry work 1 Ensure a suitable recess is provided to accommo date installation blockout mounting ring assembly L H 2 Set installation blockout mounting ring assembly L H in position and ensure that ...

Страница 5: ...ial cavities of wheel W Rotate wheel W in the direction of the OPEN mark until the gimbal optic can freely rotate and tilt Fig V To rotate the gimbal optic 360 rotatable a Grasp both sides of catching ribs E b Rotate gimbal optic to the desired orientation while observing the degree on protractor scale G To tilt the gimbal optic swivel tilted 0 20 2 steps c Insert a standard tool into hole T d Til...

Страница 6: ...5 ...

Страница 7: ...6 Open L o c k G T W E U F Fig V Fig IV ...

Страница 8: ...nfo switzerland we ef com WE EF LIGHTING United Kingdom Tel 44 844 880 5346 Fax 44 844 880 5347 info uk we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 info asiapaciƂc we ef com WE EF LIGHTING Australia Tel 61 3 8587 0444 Fax 61 3 8587 0499 info australia we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9132W0218 WE ...

Отзывы: