Installation
The work activities described here must only be performed by appropriately qualified personnel belonging to
a specialist company.
Select the installation site
The installation site must have the following properties:
1.
The installation site must be frost-proof.
2.
The device must be protected from direct sunlight.
3.
An electric power connection must be available.
4.
It is recommended that the storage space should be well aerated and ventilated.
Installation instructions (suggested installation)
The device is mounted on a wall in the utility room. The dosing line to the steam pipe should be as short as
possible.
Observe the space requirement for operating and servicing the device, see
Section 3.4 Technical Data
.
Warning and information notices must be installed in compliance with locally applicable accident
prevention regulations at the locations provided!
Installation plan
Figure 5, Suggested Installation
Steam room
Steam pipe
Dosing line
Dosing valve
Steam generator
Interlock
DUFTDOS socket
with steam
generator