![WCP SB 50 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/wcp/sb-50/sb-50_user-manual_878945006.webp)
Battery Mount (Vertical)- User Guide
(Rev 1)
Page 6
wcproducts.com
Step 1
Depending on the desired assembly method, there are two options for the bolts and
spacers. Use the desired hardware for your application.
•
Spacer Option - #10-32 x 2.5”L BHCS, #10-32 Nuts, and 2” Spacer
•
Standoff Option - #10-32 x 1/2”L BHCS and 2” Threaded Hex Standoffs
Assemble all components in the desired locations. Below is just a recommendation for
locations and components.