
5 Operation
DGS
182
Krautkrämer USM 100
Validity of the DGS method
Echo amplitude evaluations using the DGS method are
only reliable and reproducible under the following condi-
tions:
●
In test objects showing sound attenuation character-
istics that cannot be neglected, the sound attenuation
coefficient must be determined and entered in the
DGS table. For this purpose, the sound attenuation
coefficient is measured in the test object itself or in a
reference test block made of identical material, with
known reference reflectors at various distances ac-
cording to the known methods and, afterwards, en-
tered in the DGS tables. The subsequently displayed
evaluation curve will then take the effective sound at-
tenuation into account, independently of the distance.
●
The reference echo must come from the test object if
possible. If this is not possible, it should be ensured
that the reference block is made of the same material
as the test object.
●
The evaluation must be carried out using the same
probe that was used for recording the reference echo.
Another probe of the same type can be used after re-
cording a new reference echo.
●
Echo amplitudes for reflector distances smaller than
0.7 of the near-field length of the probe used are sub-
ject to considerable variations, for physical reasons,
due to the interference phenomena being effective in
this area. Evaluation results may therefore vary by
more than the usually permissible ±2 dB. It is there-
fore recommended to perform a DGS evaluation only
in ranges above 0.7 of the near-field length of the
probe.
Содержание Krautkramer USM 100
Страница 1: ...Krautkr mer USM 100 Operating Manual Id No 160M4395 Rev 9 09 2023...
Страница 14: ...14 Rev 9 09 2023 Krautkr mer USM 100 empty page...
Страница 21: ...Krautkr mer USM 100 Rev 9 09 2023 21 Introduction 1...
Страница 36: ...36 Rev 9 09 2023 Krautkr mer USM 100 empty page...
Страница 37: ...Krautkr mer USM 100 Rev 9 09 2023 37 Standard package and accessories 2...
Страница 45: ...Krautkr mer USM 100 Rev 9 09 2023 45 Initial start up 3...
Страница 66: ...66 Rev 9 09 2023 Krautkr mer USM 100 empty page...
Страница 67: ...Krautkr mer USM 100 Rev 9 09 2023 67 Principles of operation 4...
Страница 103: ...Krautkr mer USM 100 Rev 9 09 2023 103 Operation 5...
Страница 238: ...238 Rev 9 09 2023 Krautkr mer USM 100 empty page...
Страница 239: ...Krautkr mer USM 100 Rev 9 09 2023 239 Documentation 6...
Страница 257: ...Krautkr mer USM 100 Rev 9 09 2023 257 Maintenance and care 7...
Страница 267: ...Krautkr mer USM 100 Rev 9 09 2023 267 Interfaces and Peripherals 8...
Страница 287: ...Krautkr mer USM 100 Rev 9 09 2023 287 Appendix 9...
Страница 303: ...Krautkr mer USM 100 Rev 9 09 2023 303 Specifications 10...
Страница 309: ...Krautkr mer USM 100 Rev 9 09 2023 309 Index 11...
Страница 329: ...Krautkr mer USM 100 Rev 9 09 2023 329 empty page...