2020-12-V1.3
23
● Check that the ETH1 or ETH2 LED lights up.
● Connect all equipment to the switch via the Ethernet cables.
To configure each of the equipment
● Using the technical documentation of the equipment, find its IP address and TCP
port (and if necessary, for some devices, the address of the slave "Slave ID").
● If the equipment does not have an IP address, assign one to it, 192.168.1.1 for the
first device, then 192.168.1.2 for the second device, 192.168.1.3 for the third
device, and so on.
● Write down the IP address and TCP port (and if necessary, for certain devices, the
address of the Slave ID), the brand and model of the equipment, and any
information that allows it to be identified. This information will be necessary for the
installation configuration and to retrieve data.
●
The equipment communicates in Modbus RTU (RS485)
Organization of the Bus architecture:
● Gather the necessary information for each device: Bus speed, character size, parity
bit, stop bit (from the user console’s configuration wizard, get the manufacturer’s
technical documentation, or directly from the control panels of the equipment).
Содержание BOX
Страница 1: ...BOX InstallationGuide UniversalBuilding Connector 2020 12 V1 3 Made in France...
Страница 15: ...2020 12 V1 3 14 Connect the other end of the cable to the IP 852 server on the LON network...
Страница 17: ...2020 12 V1 3 16 In case of LON FT10 network Connection Make sure to have a USB Echelon U60 FT DIN gateway...
Страница 26: ...2020 12 V1 3 25...
Страница 28: ...2020 12 V1 3 27 Serial wire the network or each of the 2 networks...
Страница 37: ...2020 12 V1 3 36 Connect the other end of the cable to the IP 852 server of the LON network...